■ NDT CERTIFICATION
METRICS

Zero-Tolerance V94.2 Component Testing

Tolerance Thresholds

Inspection accuracy calibrated to micron-level tolerances. All procedures certified under ISO 9001 standards.

Every hot-gas-path component undergoes rigorous non-destructive testing and metallurgical verification. We align our precision inspection protocols with your critical outage path to guarantee absolute mechanical reliability.

Defect detection threshold: 0.05mm NDT Certifications: Level II / III Reporting: 100% Traceable

/ METALLURGICAL INTEGRITY

Uncompromising Verification Protocols

We verify the internal structure of every turbine blade and vane. Our specialized laboratory analyzes microstructural degradation to ensure components withstand extreme thermal stress.

PROTOCOL A
PROTOCOL B

Dye Penetrant Testing

Eddy Current Inspection

High-resolution liquid penetrant examinations identify micro-fissures and surface discontinuities. Essential for verifying structural integrity of Stage 1 and Stage 2 hot-gas-path components.

Electromagnetic testing detects sub-surface anomalies and coating thickness variations. Ensures precise thermal barrier coating preparation before components return to service.

+ COMPLIANCE

International Engineering Standards

Our facility operates under strict quality management systems. Every prepared component is delivered with a comprehensive metallurgical integrity report, ensuring full compliance with utility requirements.

ISO 9001:2015

EN ISO 9712

OEM Tolerances

Fully certified quality management systems governing all turbine component preparation, machining, and non-destructive testing processes.

All NDT inspections are conducted by certified Level II and Level III technicians specializing in power generation machinery.

Component preparation executed strictly within original equipment manufacturer dimensional limits, verified by coordinate measuring machines.